ISS012-E-16633

Browse image
Resolutions offered for this image:
1000 x 703 pixels 540 x 380 pixels 540 x 405 pixels 1520 x 1008 pixels 639 x 435 pixels
Cloud masks available for this image:

Spacecraft nadir point: 34.4° N, 80.3° W

Photo center point: 33.2° N, 81.6° W

Photo center point by machine learning:

Nadir to Photo Center: Southwest

Spacecraft Altitude: 184 nautical miles (341km)
Click for a map
Width Height Annotated Cropped Purpose Links
1000 pixels 703 pixels No Yes Earth From Space collection Download Image
540 pixels 380 pixels Yes Yes Earth From Space collection Download Image
540 pixels 405 pixels Yes Yes NASA's Earth Observatory web site Download Image
1520 pixels 1008 pixels No No Not enhanced Download Image
639 pixels 435 pixels No No Download Image
Other options available:
Download Packaged File
Download a Google Earth KML for this Image
View photo footprint information
Download a GeoTIFF for this photo
Image Caption: Savannah River Site, South Carolina

Situated between the South Carolina piedmont and the Atlantic Ocean, the Savannah River Site is an important part of the U.S. Department of Energy's nuclear program. Construction of the site--originally called the Savannah River Plant--began in 1951 for the purpose of generating radioactive materials necessary for nuclear weapons production during the Cold War. A total of five nuclear reactors occupy the central portion of the site and operated throughout 1953-1992. Following the end of the Cold War in 1991, activities at the Savannah River Site are now focused on disposal of nuclear wastes, environmental cleanup of the site itself, and development of advanced remediation technologies.

The Savannah River Site is located in the Sand Hills region of South Carolina and includes an area of 800 square kilometers (about 300 square miles). The southern half of the site (building clusters with reflective white rooftops) is shown in this astronaut photograph. The nearby Savannah River and its tributary creeks provided a ready source of water for the nuclear reactors; to this end, two artificial lakes ("L" Lake and Par Pond) were constructed. The meandering channel of the river and its floodplain, characterized by grey-brown sediments, is visible on the far left of the image. Because the river is so close to the nuclear site and because the underlying geological materials (sand, clay, gravel, and carbonate rocks) are permeable, an extensive and ongoing environmental monitoring and cleanup effort is necessary to reduce potential contamination of local water sources. Final remediation of wastes posing threats to surface and groundwater is scheduled to occur by 2025.